After an eight-year wait, Bengaluru’s Yellow Line, a 19km elevated corridor connecting RV Road to Bommasandra, is set to open. This crucial link in Phase II of Namma Metro will connect south Bengaluru to the Electronics City IT hub, featuring 16 stations and costing ₹7,610 crore.